首页> 外文期刊>Journal of Project Management >A new methodology in generating Digital Plants in AVEVA PDMS from Navisworks? model
【24h】

A new methodology in generating Digital Plants in AVEVA PDMS from Navisworks? model

机译:Navisworks在AVEVA PDMS中生成数字工厂的新方法?模型

获取原文
           

摘要

In the past, due to the use of two-dimensional design, the probability of error in large projects increased. Over time, the need for a digital 3D model has increased in the lifetime of refineries, petrochemicals and power plants. Today, the editable digital 3D model is the basic needs of industrial plants. The Abadan Oil Refinery Co., due to its need for inspections and possible changes in the refinery, has also needed an editable 3D Digital Plant during the past few years. In this paper, with the development of a new methodology, the non-editable Navisworks? model of phase 1 and 3 of Abadan Oil Refinery was transformed into an editable Digital 3D model in AVEVA PDMS. In this methodology, the PDMS programming language called Programming Macro Language (PML) as well as .net code was used. Finally, using the Navisworks? model, these two phases, which consisted of 38 Areas, 2185 equipment, 17966 pipes, 7046 instruments, and 2617 structures were converted into an editable PDMS model for nine months.
机译:过去,由于使用二维设计,大型项目中出现错误的可能性增加。随着时间的流逝,在炼油厂,石化产品和发电厂的使用寿命中,对数字3D模型的需求不断增加。如今,可编辑的数字3D模型已成为工厂的基本需求。由于需要检查和可能对炼油厂进行更改,阿巴丹炼油厂有限公司在过去的几年中还需要一个可编辑的3D数字工厂。在本文中,随着新方法的发展,不可编辑的Navisworks?阿巴丹炼油厂第1和第3阶段的模型被转换为AVEVA PDMS中的可编辑数字3D模型。在这种方法中,使用了称为编程宏语言(PML)的PDMS编程语言以及.net代码。最后,使用Navisworks吗?在这两个阶段中,将这38个区域,2185个设备,17966管道,7046仪器和2617个结构组成的阶段转换为可编辑的PDMS模型,历时9个月。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号