Cost analysis of a coal-fired power plant using the NPV method

机译:使用净现值法的燃煤电厂成本分析

获取原文
           

摘要

The present study investigates the impact of various factors affecting coal-fired power plant economics of 210?MW subcritical unit situated in north India for electricity generation. In this paper, the cost data of various units of thermal power plant in terms of power output capacity have been fitted using power law with the help of the data collected from a literature search. To have a realistic estimate of primary components or equipment, it is necessary to include the latest cost of these components. The cost analysis of the plant was carried out on the basis of total capital investment, operating cost and revenue. The total capital investment includes the total direct plant cost and total indirect plant cost. Total direct plant cost involves the cost of equipment (i.e. boiler, steam turbine, condenser, generator and auxiliary equipment including condensate extraction pump, feed water pump, etc.) and other costs associated with piping, electrical, civil works, direct installation cost, auxiliary services, instrumentation and controls, and site preparation. The total indirect plant cost includes the cost of engineering and set-up. The net present value method was adopted for the present study. The work presented in this paper is an endeavour to study the influence of some of the important parameters on the lifetime costs of a coal-fired power plant. For this purpose, parametric study with and without escalation rates for a period of 35?years plant life was evaluated. The results predicted that plant life, interest rate and the escalation rate were observed to be very sensitive on plant economics in comparison to other factors under study.
机译:本研究调查了影响印度北部210 MW亚临界机组发电的燃煤电厂经济的各种因素的影响。在本文中,借助于从文献检索中收集到的数据,使用功率定律拟合了火电厂各个单位的功率输出容量方面的成本数据。为了对主要组件或设备进行实际的估算,有必要包括这些组件的最新成本。该工厂的成本分析是根据总资本投资,运营成本和收入进行的。总资本投资包括直接工厂总成本和间接工厂总成本。直接工厂总成本涉及设备成本(即锅炉,汽轮机,冷凝器,发电机和辅助设备,包括冷凝水抽水泵,给水泵等)以及与管道,电气,土建,直接安装,辅助服务,仪器和控制以及现场准备。间接工厂的总成本包括工程和安装成本。本研究采用净现值法。本文中介绍的工作是研究一些重要参数对燃煤电厂寿命成本的影响的努力。为此,评估了在35年的生命周期内是否进行升级的参数研究。结果预测,与研究中的其他因素相比,观察到植物寿命,利率和升级率对植物经济学非常敏感。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号