首页> 外文期刊>Journal of Industrial Engineering and Management >Resource scheduling of workflow multi-instance migration based on the shuffled leapfrog algorithm
【24h】

Resource scheduling of workflow multi-instance migration based on the shuffled leapfrog algorithm

机译:基于改组越级算法的工作流多实例迁移资源调度

获取原文
           

摘要

Purpose: When the workflow changed, resource scheduling optimization in the process of the current running instance migration has become a hot issue in current workflow flexible research; purpose of the article is to investigate the resource scheduling problem of workflow multi-instance migration. Design/methodology/approach: The time and cost relationships between activities and resources in workflow instance migration process are analyzed and a resource scheduling optimization model in the process of workflow instance migration is set up; Research is performed on resource scheduling optimization in workflow multi-instance migration, leapfrog algorithm is adopted to obtain the optimal resource scheduling scheme. An example is given to verify the validity of the model and the algorithm. Findings: under the constraints of resource cost and quantity, an optimal resource scheduling scheme for workflow migration is found, ensuring a minimal running time and optimal cost.
机译:目的:当工作流发生变化时,当前正在运行的实例迁移过程中的资源调度优化已成为当前工作流灵活研究中的热点问题;本文的目的是研究工作流多实例迁移的资源调度问题。设计/方法/方法:分析工作流实例迁移过程中活动与资源之间的时间和成本关系,建立工作流实例迁移过程中的资源调度优化模型;对工作流多实例迁移中的资源调度优化进行了研究,采用跳越算法获得了最优的资源调度方案。给出一个实例验证模型和算法的有效性。发现:在资源成本和数量的约束下,找到了用于工作流迁移的最佳资源调度方案,从而确保了最少的运行时间和最佳成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号