Congestion management in high voltage transmission line using thyrister controlled series capacitors (TCSC)

机译:使用晶闸管控制串联电容器(TCSC)的高压输电线路拥塞管理

获取原文
           

摘要

Congestion management is one of the technical challenges in power system deregulation. In deregulated electricity market transmission congestion occurs when there is insufficient transmission capacity to simultaneously accommodate all constraints for transmission of a line. Flexible alternative current transmission system (FACTS) devices can be an alternative to reduce the flows in heavily loaded lines, resulting in an increased loadability, low system loss, improved stability of the network, reduced cost of production and fulfilled contractual requirement by controlling the power flow in the network. Proper location of a FACTS controller is key to maximize its benefits. This paper also demonstrates the ability of FACTS devices to reduce the overall operating cost and their impact on transmission pricing. A sensitivity factor based approach is used for the optimal placement of the thyrister controlled series capacitors (TCSC) to minimize the congestion cost. The sensitivity of the congested line flow with respect to flow in other lines has been used for the placement of the TCSC. The effectiveness of the proposed method has been demonstrated on IEEE 14-bus system.
机译:拥塞管理是电力系统放松管制的技术挑战之一。在放松管制的电力市场中,当传输容量不足以同时容纳所有线路传输约束时,就会发生传输拥塞。灵活的备用电流传输系统(FACTS)设备可以减少负载线路中的流量,从而增加了负载能力,降低了系统损耗,改善了网络的稳定性,降低了生产成本并通过控制电源满足了合同要求在网络中流动。 FACTS控制器的正确位置是最大化其优势的关键。本文还展示了FACTS设备降低总体运行成本的能力及其对输电价格的影响。基于灵敏度因子的方法用于优化可控硅串联电容器(TCSC)的位置,以最大程度地降低拥塞成本。拥塞管线流量相对于其他管线流量的敏感度已用于TCSC的放置。该方法的有效性已在IEEE 14总线系统上得到证明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号