...
首页> 外文期刊>HYDRO Nepal: Journal of Water, Energy and Environment >Effect of Sand Erosion on Turbine Components: A Case Study of Kali Gandaki “A” Hydroelectric Project (144 MW), Nepal
【24h】

Effect of Sand Erosion on Turbine Components: A Case Study of Kali Gandaki “A” Hydroelectric Project (144 MW), Nepal

机译:沙蚀对涡轮机部件的影响:以尼泊尔卡里甘达基“ A”水电项目(144兆瓦)为例

获取原文
   

获取外文期刊封面封底 >>

       

摘要

In high sediment laden river projects or silt affected power stations, the frequency of repair and maintenance of underwater parts is comparatively higher which leads to increase the overall forced outages per year for repair The extent of the major maintenance will depend on the operating condition such as suspended sediment load passing through the turbine and how the machine was loaded during the operation. This paper illustrates the analysis of sediments, effect of sand erosion and maintenance of turbine of Kali Gandaki “A” Hydroelectric Plant (144 MW). The paper also describes the repair methods used for different turbine components to minimize the effects induced by sediment erosion. HYDRO Nepal Journal Journal of Water, Energy and Environment Issue: 17, July 2015
机译:在高含沙量的河流项目或受淤泥影响的电站中,水下部件的维修和保养频率相对较高,这导致每年维修的总强迫停机次数增加。主要维修的程度将取决于运行状况,例如穿过涡轮机的悬浮泥沙负荷以及运行期间机器的装载方式。本文说明了Kali Gandaki“ A”级水电站(144 MW)的沉积物分析,沙土侵蚀的影响以及涡轮机的维护。本文还介绍了用于不同涡轮机部件的维修方法,以最大程度减少沉积物侵蚀引起的影响。 HYDRO Nepal Journal水,能源与环境学报发行:2015年7月17日

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号