...
首页> 外文期刊>HYDRO Nepal: Journal of Water, Energy and Environment >Energy Banking with India : Path of Least Resistance
【24h】

Energy Banking with India : Path of Least Resistance

机译:与印度的能源银行:最低阻力之路

获取原文

摘要

Once the 456 MW Upper Tamakoshi Hydroelectric Project is commissioned by the end of 2018, Nepal is expected to have surplus energy during the wet/monsoon season of 2019. Nepal’s Energy Ministry has decided to resolve this surplus issue through Energy Banking with India whereby Nepal exports her wet season power for India’s dry season import on “the same volume”. This is an extremely na?ve assumption even if it is for the sake of mere negotiation. Discussing the short-sightedness of Energy Banking concept, this article stresses that Nepal should have, instead, activated the other two prevailing instruments of power trading, that of bilateral and regional 2014 Indo-Nepal Electric Power Trade, Cross-Border Transmission and Grid Connectivity Agreement and the 2014 SAARC Framework Agreement for Energy Cooperation (Electricity) respectively. Activating these two agreements would have ‘Open Sesame’-d the doors to Nepal’s growing hydropower capabilities – a win-win situation for both countries.?HYDRO Nepal JournalJournal of Water, Energy and Environment Issue: 23Year: 2018.
机译:一旦456兆瓦的上游Tamakoshi水电站项目于2018年底投入运行,预计尼泊尔将在2019年的雨季和雨季获得过剩的能源。尼泊尔能源部已决定通过与印度的能源银行解决这一过剩问题,据此尼泊尔出口她在印度旱季进口的“雨季”功率为“相同”。即使只是为了谈判,这也是一个非常幼稚的假设。在讨论能源银行概念的短视性时,本文强调,尼泊尔应该改为激活其他两种主要的电力贸易工具,即双边和区域性的2014年印度-尼泊尔电力贸易,跨境输电和电网连接协议和2014 SAARC能源合作框架协议(电力)。激活这两个协议将“打开芝麻”,为尼泊尔不断发展的水电能力打开大门-这对两国都是双赢的局面。《水力发电尼泊尔杂志》水,能源与环境学报,第23年:2018年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号