首页> 外文期刊>HYDRO Nepal: Journal of Water, Energy and Environment >Probabilistic Approach for Assessing Rock Mass Quality in the Tunnel
【24h】

Probabilistic Approach for Assessing Rock Mass Quality in the Tunnel

机译:隧道岩体质量评估的概率方法

获取原文
获取外文期刊封面目录资料

摘要

Rock mass is a heterogeneous media and the quality of the rock mass may change within a very short distance. As a result, on many occasions considerable discrepancies (variations) have been found between the predicted and actual rock mass conditions along the tunnel alignment, resulting in signifi cant cost and time overruns. Finding innovative solutions for quantifying the quality of rock mass and assessing the risk of discrepancies are, therefore, key issues for cost effective and optimum tunneling solutions in the Himalayan region. In this paper, a probabilistic approach of uncertainty analysis has been proposed to evaluate the quality of rock mass based on the Q-system of rock mass classifi cation. Mapped rock mass quality data from the Modi headrace tunnel from Nepal have been used as a case study. The degree of correlation between the simulated results achieved by a probabilistic assessment using @Risk and values actually measured in the tunnel have been discussed. It is concluded that the probabilistic approach can be used as a tool in predicting rock mass quality and assessing risk in tunneling projects. DOI: http://dx.doi.org/10.3126/hn.v11i0.7154 Hydro Nepal Vol.11 2011 pp.6-11
机译:岩体是一种非均质介质,岩体的质量可能会在很短的距离内发生变化。结果,在很多情况下,沿隧道走向的预测岩体状况与实际岩体状况之间发现了相当大的差异(差异),从而导致大量成本和时间超支。因此,寻找可量化岩体质量和评估差异风险的创新解决方案是喜马拉雅地区具有成本效益和最佳隧道解决方案的关键问题。本文提出了一种基于岩体分类Q系统的不确定性概率分析方法来评价岩体质量。来自尼泊尔的莫迪引水道隧道的映射岩体质量数据已用作案例研究。讨论了通过使用@Risk进行概率评估获得的模拟结果与隧道中实际测量的值之间的相关程度。结论是,概率方法可以用作预测岩体质量和评估隧道工程风险的工具。 DOI:http://dx.doi.org/10.3126/hn.v11i0.7154 Hydro Nepal Vol.11 2011 pp.6-11

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号