How provincial and local discourses aligned against the prospect of dam removal in New Brunswick, Canada

机译:加拿大新不伦瑞克省省市和地方政府如何与拆除大坝的前景保持一致

获取原文
       

摘要

In 2013, the state-owned electrical energy utility in New Brunswick, Canada, announced that a problem with concrete expansion was shortening by 40 years the expected life of the 660 MW Mactaquac Generating Station on the Saint John River. Its construction late in the 1960s, and the subsequent inundation of 10,000 hectares (ha) was part of a regional modernisation programme. Locals lost homes, agricultural land, communities and landmarks and a new mill changed livelihoods and attracted new people. In the intervening decades, the reservoir has become locally cherished for waterfront living and pleasure boat recreation. Since 2012, independent social science research about the fate of the dam and headpond has been undertaken in parallel with stakeholder engagement and public relations by the electricity utility. The final decision was delivered late 2016. The chosen option was to extend the dam’s life through repairs in situ, not one of the options formally under consideration. This paper presents provincial-scale discourses on the Mactaquac decision, using a 2014 energy survey of 500 New Brunswick residents which included questions about the Mactaquac decision. Analysis reveals how provincial preferences aligned with local qualitative research (summarised in an Appendix), revealing preferences for ongoing headpond amenity and the avoidance of further trauma associated with major landscape change. Preferences of First Nations to remove the dam may yet prove disruptive to the announced option. The discussion summarises aspects of the case study relevant to other instances of dam removal and landscape transition, as well as exploring options for further theoretical development, testing or application. These opportunities include: why males and females demonstrated different scales of concern around Mactaquac; the implications of different framings of hydroelectricity development (e.g. sacrificial landscape or local energy) on removal debates; and, how public decision-making can usefully engage with rather than dismiss uncertainty and path dependency.
机译:2013年,加拿大新不伦瑞克省的国有电力公司宣布,混凝土膨胀问题使圣约翰河上660兆瓦Mactaquac发电站的预期寿命缩短了40年。它于1960年代后期建造,随后淹没10,000公顷,这是区域现代化计划的一部分。当地人失去了家园,农田,社区和地标,新的工厂改变了生计并吸引了新的人们。在随后的几十年中,该水库已成为当地人珍惜的滨水生活和休闲船娱乐场所。自2012年以来,电力公司与利益相关者的参与和公共关系同时进行了有关大坝和头顶命运的独立社会科学研究。最终决定于2016年下半年做出。选择的方案是通过现场修复来延长大坝的使用寿命,而不是正式考虑的方案之一。本文使用2014年对500名新不伦瑞克居民的能源调查,介绍了有关Mactaquac决定的省级论述,其中包括有关Mactaquac决定的问题。分析揭示了省级偏好与本地定性研究(附录中概述)如何匹配,揭示了对正在进行的急救便利以及避免与主要景观变化相关的进一步伤害的偏好。原住民拆除大坝的偏好可能会破坏已宣布的选择。讨论总结了案例研究的其他方面,这些案例研究与大坝拆除和景观过渡的其他实例相关,并探讨了进一步理论开发,测试或应用的选择。这些机会包括:为什么男性和女性对Mactaquac表现出不同程度的关注;水电开发的不同框架(例如牺牲景观或当地能源)对拆除辩论的影响;以及公共决策如何能够有效地参与而不是消除不确定性和路径依赖。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号