首页> 外文期刊>Procedia CIRP >Varying Repair Capacity in a Repairable Item System
【24h】

Varying Repair Capacity in a Repairable Item System

机译:在可维修项目系统中改变维修能力

获取原文
获取外文期刊封面目录资料

摘要

Expensive parts of machines do not have to be discarded when broken. Instead they can be repaired and put back into stock, forming a repairable item system. Lots of methods are known to determine stock levels, the number of backordered parts and waiting times in repairable item systems. Some of these methods consider limited repair capacity, but assume the capacity to be constant. In industrial practice, however, the capacity in the repair shop varies due to vacation times of the workers, reducing it temporarily. At the end of the vacation times the backorders of unrepaired, broken parts in the repair shop and unfulfilled part requests at the depot have to be diminished. Furthermore, the varying capacity influences the performance of the spare parts provisioning, incurring the need for higher stock levels. The impact of varying repair capacity on a system for repairable items is analyzed in this paper. It is shown how the stock levels have to be adjusted to guarantee a maximum backorder level of waiting request during the entire year.
机译:机器的昂贵零件在损坏时不必丢弃。而是可以对其进行维修并放回库存,从而形成可维修的物品系统。已知许多方法可确定可维修项目系统中的库存水平,缺货零件的数量和等待时间。这些方法中的某些方法考虑到有限的维修能力,但假定维修能力是恒定的。然而,在工业实践中,维修车间的产能因工人的休假时间而有所不同,因此暂时减少了。在休假时间结束时,必须减少未维修,维修车间中损坏的零件以及在仓库中未能满足的零件需求的缺货订单。此外,容量的变化会影响备件供应的性能,从而需要更高的库存水平。本文分析了不同维修能力对可维修项目系统的影响。它显示了如何调整库存水平,以确保全年最大的等待订单积压水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号