首页> 外文期刊>The electronic journal of geotechnical engineering >Selection of Excavation Method for Shallow Buried Tunnels with Surrounding Rock Based on Fuzzy Theory
【24h】

Selection of Excavation Method for Shallow Buried Tunnels with Surrounding Rock Based on Fuzzy Theory

机译:基于模糊理论的浅埋暗挖隧道开挖方法选择

获取原文
       

摘要

The II standard tunnel across the West extension line of Changsha Zhuzhou Xiangtan complex passes through the complex building structures of the golden family courtyard. The original design was excavated by the open excavation method. But the open excavation method has great disturbance to the surrounding ring environment, and the social stability risk is high, so it can not be implemented. Therefore, this paper constructs the fuzzy model of the excavation method, analyzes the technical factors, the safety factors, the economic factors and the social factors, and determines the appropriate excavation method. The method in this paper can provide technical reference for similar projects.
机译:穿越长沙株洲湘潭综合大楼西延线的II型标准隧道穿过金色家庭庭院的复杂建筑结构。原始设计采用露天开挖方法进行开挖。但是,露天开挖法对周围环境影响较大,社会稳定风险高,无法实施。因此,本文构建了开挖方法的模糊模型,分析了技术因素,安全因素,经济因素和社会因素,并确定了合适的开挖方法。本文方法可为类似工程提供技术参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号