...
【24h】

BOLSA CHICA WETLANDS RESTORATION INLET DESIGN

机译:BOLSA CHICA湿地修复入口设计

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Bolsa Chica Wetlands is one of a few recently restored large wetlands in Southern California of the United States. The project required restoration of tidal flooding of some isolated wetlands while minimizing impacts to the shoreline adjacent to the new inlet and maintenance costs, preserving endangered species on site, and maintaining oil field operations along the periphery of the project. The project created a direct connection to the ocean through wetland basins that included a full tidal basin, muted tidal basins and seasonal ponds linked by a series of ocean jetties, levees, water control structures, culverts, and channels. The inlet is a key project feature and has been the focus of numerous technical studies and numerical modeling tasks. As part of theses analyses, a pre-filled ebb bar was designed and about 1 million cubic yards of clean sand from the lowlands dredging was placed offshore to minimize the anticipated impacts of the inlet opening to the shoreline. This paper presents the inlet location selection, inlet and wetland hydrodynamics, inlet dimension optimization, inlet stability analyses, and jettied inlet entrance design. It also discusses findings of comparison between model predictions and field measurements of tidal elevations and sediment accumulations in the wetland basin since the completion of the project in August 2006. This project received the first Project Excellence Award from COPRI (Coasts, Oceans, Ports and Rivers Institute) of the American Society of Civil Engineers in 2008.
机译:Bolsa Chica湿地是美国南加州最近恢复的少数几个大型湿地之一。该项目要求恢复一些偏远湿地的潮水泛滥,同时最大程度地减少对与新进水口和维护成本相邻的海岸线的影响,保护现场濒危物种,并维持项目外围的油田运营。该项目通过湿地盆地建立了与海洋的直接连接,包括一个完整的潮汐盆地,无声的潮汐盆地和季节性池塘,这些池塘由一系列的海洋码头,堤坝,水控制结构,涵洞和航道连接。入口是关键的项目功能,并且一直是众多技术研究和数值建模任务的重点。作为这些分析的一部分,设计了一个预填充的退潮杆,并将来自低地疏about的约100万立方码的干净沙子放置在海上,以最大程度地减少进口对海岸线的预期影响。本文介绍了进水口位置选择,进水口和湿地流体动力学,进水口尺寸优化,进水口稳定性分析以及喷射式进水口设计。它还讨论了自2006年8月项目完成以来湿地盆地潮汐高程和沉积物累积的模型预测与实测值之间的比较结果。该项目获得了COPRI(海岸,海洋,港口和河流)的首个项目卓越奖美国土木工程师学会,2008年。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号