Some of the largest precast prestressed concrete girders used to date in the United States are currently being installed on the West Seattle Freeway Bridge in Washington. This report des'/> Approach Spans to the West Seattle Bridge
首页> 外文期刊>PCI journal >Approach Spans to the West Seattle Bridge
【24h】

Approach Spans to the West Seattle Bridge

机译:跨过西西雅图桥

获取原文
           

摘要

align="left">Some of the largest precast prestressed concrete girders used to date in the United States are currently being installed on the West Seattle Freeway Bridge in Washington. This report describes the design/construction system adopted for the project's Harbor Island, West Interchange, and East Interchange units.
机译:align =“ left”>一些美国迄今为止最大的预制预应力混凝土梁目前正在华盛顿的西西雅图高速公路大桥上安装。本报告描述了该项目的港口岛,西交汇处和东交汇处所采用的设计/施工系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号