Abandoned borrow pits and the associated risks are on the increase following rising trend in road construction in many developing countries. Notable risk factors include: frequent sliding, loss of life and ecosystem services, groundwater contamination, and loss of arable land. Reclamation of borrow pits should go by earth-moving; moving spoil heap and adjoining land area to fill the pit. This is followed by compaction and in-situ and laboratory testing to achieve the original geotechnical ground condition. Operators, host community and the government agency must agree and enforce reclamation of borrow pits soon after use. Borrow pits should be properly sited, planned and designed by professionals, with provision of appropriate safety measures. Reclaiming a borrow pit should be as important as opening a borrow pit, towards sustainable engineering and environment.
机译:在许多发展中国家,随着公路建设的上升趋势,废弃的借款坑和相关风险正在增加。显着的风险因素包括:频繁滑坡,生命和生态系统服务丧失,地下水污染以及耕地损失。取土场的开垦应通过土方进行;移动弃土堆并邻接土地以填满坑。接下来是压实以及现场和实验室测试,以达到原始的岩土地面条件。操作人员,东道国社区和政府机构必须在使用后尽快达成共识并强制进行填坑的填海。借坑应由专业人员适当地布置,计划和设计,并提供适当的安全措施。回收废料坑与为可持续工程和环境开放废料坑一样重要。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号