首页> 外文期刊>Software Engineering >The Economic Importance of Business Software Systems Functional Size Measurement
【24h】

The Economic Importance of Business Software Systems Functional Size Measurement

机译:商业软件系统功能大小度量的经济重要性

获取原文
           

摘要

Execution of Business Software Systems (BSS) Development and Enhancement Projects (D&EP) encounters many problems, leading to the high scale of their failure, which then is reflected in considerable financial losses. One of the fundamental causes of such projects’ low effectiveness are improperly derived estimates for their costs and time. In their case, the budget and time frame are determined by the effort being spent on activities needed to deliver product that would be meeting client’s requirements. Meanwhile, objective and reliable effort estimation still appears to be a great challenge, what in the author’s opinion is caused by effort estimation based on resources, while such planning activity should base on the required software product size, which determines work effort. Estimation of BSS size requires using of the suitable software size measure, which has been sought for several decades now. What’s more, it is worth using the capabilities offered by such measure for the BSS D&EP assessment from the perspective being critical to a client, that is from functional perspective. Thus this paper analyses capabilities, being significant from the economic point of view, of taking advantage of suitable approach to the BSS size measurement, with particular consideration given to the two most popular functional size measurement methods normalized by ISO/IEC, namely International Function Point Users Group (IFPUG) method and Common Software Measurement International Consortium (COSMIC) method. This should contribute to the better understanding of the importance of this issue, still being underestimated by business managers – as in the subject literature this issue is usually?considered from the technical point of view. Meanwhile, suitable BSS size measurement should constitute the basis for rational activities and business decisions not only for providers, but also for clients needs.
机译:商业软件系统(BSS)开发和增强项目(D&EP)的执行遇到许多问题,导致其大规模失败,然后反映为可观的财务损失。此类项目效率低下的根本原因之一是对成本和时间的估算不正确。在他们的情况下,预算和时间范围取决于在交付满足客户要求的产品所需的活动上花费的精力。同时,客观而可靠的工作量估算似乎仍然是一个巨大的挑战,作者认为这是基于资源的工作量估算引起的,而这种计划活动应基于确定工作量的所需软件产品规模。 BSS大小的估计需要使用合适的软件大小度量,这已经有几十年了。而且,从对客户至关重要的角度(即从功能角度),值得将这种方法提供的功能用于BSS D&EP评估。因此,本文从经济角度分析了利用合适方法进行BSS尺寸测量的能力,特别是考虑了ISO / IEC标准化的两种最受欢迎​​的功能尺寸测量方法,即国际功能点用户组(IFPUG)方法和通用软件度量国际联盟(COSMIC)方法。这应该有助于更好地理解此问题的重要性,但业务经理仍然低估了这一点–因为在主题文献中,通常从技术角度考虑此问题。同时,适当的BSS大小测量应构成合理活动和业务决策的基础,不仅要针对提供者,还要满足客户的需求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号