首页> 外文期刊>Science Discovery >Preliminary Study on Tunnel Pre-lining Method and Machine
【24h】

Preliminary Study on Tunnel Pre-lining Method and Machine

机译:隧道预衬方法及机械的初步研究

获取原文
获取外文期刊封面目录资料

摘要

Mining method was mainly used for the tunnel construction in many areas of our country, which requires more human resources relatively. With the labor force Increasingly, the application of mining method was relatively limited. Pre-lining technology was used to build the pre-lining arch shell in the tunnel arch before the tunnel was excavated. With the protection of the pre-lining arch shell, the whole section or step excavation method were prior choice to realize the mechanized excavation, further to improve the construction efficiency and to save the labor costs. It was showed that the pre-lining equipment has good match with the pre-lining construction method and can meet the requirements of the pre-lining technical.
机译:采矿法主要用于我国许多地区的隧道建设,相对需要更多的人力资源。随着劳动力的日益增加,采矿方法的应用相对有限。在开挖隧道之前,先采用衬砌技术在隧道拱中建造衬砌拱壳。在预衬拱壳的保护下,优先采用全断面或阶梯开挖的方法来实现机械化开挖,进一步提高了施工效率,节省了人工成本。结果表明,该预衬设备与预衬施工方法具有很好的匹配性,可以满足预衬技术的要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号