首页>
外文期刊>Research Journal of Fisheries and Hydrobiology
>“Appling the Multiple Criteria-Decision-Making procedures in Environmental Management of Ecotourism in Protected Areas (Case stady :Tange-Sayad in Chaharmahal &Bakhteyari Province)” AHP
【24h】
“Appling the Multiple Criteria-Decision-Making procedures in Environmental Management of Ecotourism in Protected Areas (Case stady :Tange-Sayad in Chaharmahal &Bakhteyari Province)” AHP
Ecotourism development is a tangible and permanent strategy to persistence theprotected area by systematic planning. Suitable planning and management ofecotourism function are most functional multi- variable decision- making in protectedarea which is depend on environmental factors. Protected area “Tang- sayad” is 27000hectore and located in Chaharmahal & Bakhteyari province. It has capability to ahractecotourism due to steep ecosystem with special vegetative coverage and animalpopulation, natural attractiveness and its position near to province center, significantenvironmental variants, available road, beautiful mountain ecosystem perspective(view), beautiful rocks and suitable weather. The aim of the research is to presentecosystem ecotourism management and stress on environmental issues in protectedarea. AHP procedure was selected base on studies and different multiple criteriadecision making method due to its accuracy and other advan tages. Three effectivecriteria on ecotourism function were selected base on field surveys and managementprojects of ecotourism area stable resources GEF and consult with experts (naturalenvironment factors, social- educational factors- economical factors), then fourecotourism functions according to protection function were selected base on visitorsaltitude to work with AHP. The best option was selected base on these criteria andhierarchical analyse and expert choice software to reach group function byquestionnaire, weighting to options and data analyse, was presented base onmanagement remedy.
展开▼