Process Adaption and Modifications of a Nutrient Removing Wastewater Treatment Plant in Sri Lanka Operated at Low Loading Conditions

机译:在低负荷条件下运行的斯里兰卡营养去除废水处理厂的工艺改造和改造

获取原文
       

摘要

The Sri Lankan national water authority, that is The National Water Supply and Drainage Board (NWS&DB) has taken a new wastewater treatment plant into operation at Ja Ela, North of Colombo. The plant has been in operation since September 2011. In April 2012, it was concluded how a test of the aeration efficiency and a performance test should be carried out. The tests have been based on the actual loading of the plant and the analysis results from the daily process control. The evaluation of the aeration efficiency is not reported in this paper. The paper presents the overall performance of the water treatment part of the plant during start-up conditions, from fall 2011 through the first five months of 2012. The results from the operation are found in Table 1. An important circumstance at the plant is the current very low loading in comparison with the design load. This fact has resulted in an introduction of an intermittent mode of the aeration (nitrification) reactor. Based on operation figures, during more than a month (May 2012), it has been possible to give a realistic assessment of the overall performance. The most striking results are summarized as follows: 1) The intermittent operation has enabled an energy efficient operation of the plant. By the introduction of the intermittent aeration, the energy consumption has been reduced by around 75%, compared with the continuous operation mode; 2) The plant performance during the intermittent operation has been improved with respect to virtually all important pollution variables. The most striking improvement is the discharge total P level, reflecting that a substantial enhanced biological phosphorus removal takes. The typical discharge levels found during May 2012, were compared with the earlier obtained values. It is important to underline that the loading on the plant has slightly increased during May as compared with the previous operation period.
机译:斯里兰卡国家水务部门,即国家供水和排水委员会(NWS&DB),已经在科伦坡以北的Ja Ela新建了一座废水处理厂。该工厂自2011年9月开始运行。2012年4月,得出结论:如何进行曝气效率测试和性能测试。这些测试基于工厂的实际负荷和日常过程控制的分析结果。这篇论文没有对曝气效率进行评估。本文介绍了从2011年秋季到2012年的前五个月,该工厂水处理部分在启动条件下的总体性能。运行结果如表1所示。该工厂的一个重要情况是:与设计负载相比,当前的负载非常低。这一事实导致引入了曝气(硝化)反应器的间歇模式。根据运营数据,在一个多月(2012年5月)中,可以对整体绩效进行实际评估。最惊人的结果总结如下:1)间歇运行使工厂实现了节能运行。通过引入间歇曝气,与连续运行模式相比,能耗降低了约75%。 2)几乎所有重要的污染变量在间歇运行期间的工厂性能都得到了改善。最显着的改善是排放总磷水平,反映出生物磷去除量大大提高。将2012年5月发现的典型排放水平与先前获得的值进行比较。重要的是要强调指出,与前一运营时期相比,5月份工厂的负荷略有增加。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号