...
首页> 外文期刊>Network Pharmacology >Comparative study of risk administration in centralized and distributed software development atmosphere
【24h】

Comparative study of risk administration in centralized and distributed software development atmosphere

机译:集中式和分布式软件开发环境下风险管理的比较研究

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Risk administration is used to increase the possibility of success of any future project by exploring itsreservations. It will meet all the remedies to make the software development project successful by keeping inview all the future problems that may occur during the project process. It includes the identification of risk andtheir assessment in the project course and tries to make improvement to make project constructive. Riskadministration goals are to overcome project task risks those are identified before starting of the project andduring the implementation. This paper describes the phases in the risk administration process and providedmethods to analysis and safety of administration. The paper focuses on a study risk administration incentralized and distributed software development projects. This study recognizes valuable, constant and freecommunication as the basics for victorious risk administration. Therefore, it registers all incoming informationmemorize much in the same pattern as the “black box” device during an aircraft flight. The description andevaluation tools are also included, may be used during the risk administration study in the softwaredevelopment atmosphere.
机译:风险管理用于通过探索其保留来增加任何未来项目成功的可能性。通过查看项目过程中将来可能出现的所有问题,它将满足使软件开发项目成功的所有补救措施。它包括项目过程中的风险识别和评估,并尝试进行改进以使项目具有建设性。风险管理目标是克服项目任务风险,这些风险是在项目开始之前和实施过程中确定的。本文介绍了风险管理流程的各个阶段,并为分析和安全管理提供了方法。本文重点研究风险管理集中和分布式软件开发项目。这项研究认识到有价值的,持续的和自由的交流是胜利风险管理的基础。因此,它在飞机飞行期间以与“黑匣子”设备相同的模式注册所有传入的信息存储。描述和评估工具也包括在内,可在软件开发环境下的风险管理研究中使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号