...
首页> 外文期刊>Network and Complex Systems >Application of Idle/ Waiting Time Operator Oi,W on Two Stage Flow Shop Scheduling Problem with Arbitrary Lags
【24h】

Application of Idle/ Waiting Time Operator Oi,W on Two Stage Flow Shop Scheduling Problem with Arbitrary Lags

机译:空闲/等待时间算子Oi,W在任意时滞两阶段流水车间调度问题中的应用

获取原文
   

获取外文期刊封面封底 >>

       

摘要

In this paper an attempt is made to study n jobs over two machines where processing times are associated with respective probabilities and also Idle/Waiting Time Operator O i,w is used for equivalent job block as well as transportation time in addition with arbitrary lags i.e. start lag or stop lag. The objective of the study is to propose an algorithm by which we can minimize the total elapsed time in two stage flow shop scheduling with considering various system parameters. A numerical illustration is also given to clarify the proposed concept.
机译:在本文中,尝试研究两台机器上的n个作业,其中处理时间与各自的概率相关,并且空闲/等待时间算子O i,w用于等效作业块以及运输时间以及任意滞后,即开始滞后或停止滞后。该研究的目的是提出一种算法,通过该算法,我们可以在考虑各种系统参数的情况下最小化两阶段流水车间调度中的总经过时间。还给出了数字说明以澄清提出的概念。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号