Design of Software for Maintenance Workforce Scheduling (A Case Study of Afam Power Station, Nigeria)

机译:维修人员调度软件的设计(以尼日利亚阿法姆电站为例)

获取原文

摘要

This paper is concerned with the optimization of the workforce scheduling for solving maintenance problems. To achieve this aim an optimsation software for (5, 7) problem was developed. The programme was written in Quick Basic. The software was designed to produce a seven day schedule for organization operating a seven day week. Hence organization operating a five day schedule wishing to change to a seven day schedule we find this software very useful. The Quick-Basic computer programme was based on Alfares [1, 2] algorithm for solving (5,7) schedule problem. Data collected from Afam power station, Nigeria was used as input data. The test result shows the software is capable of determining workforce size and assigning workers to day-off pattern. The seven-day schedule produced savings of 11% maintenance labour cost when compared with the 5-day schedule currently being practiced by the Power station [3].
机译:本文涉及用于解决维护问题的劳动力调度的优化。为了达到这个目的,开发了针对(5,7)问题的优化软件。该程序是用Quick Basic编写的。该软件旨在为组织每周工作7天提供7天计划。因此,组织希望将五天时间表更改为七天时间表,我们发现该软件非常有用。 Quick-Basic计算机程序基于Alfares [1,2]算法,用于解决(5,7)计划问题。从尼日利亚Afam电站收集的数据用作输入数据。测试结果表明,该软件能够确定员工人数,并为员工分配休假模式。与电站目前正在实施的5天计划相比,7天计划节省了11%的维护人工成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号