...
首页> 外文期刊>Mechanical Engineering Journal >Progress and utilization of Nakoso 250 MW air-blown IGCC demonstration project
【24h】

Progress and utilization of Nakoso 250 MW air-blown IGCC demonstration project

机译:Nakoso 250 MW风吹式IGCC示范项目的进展与利用

获取原文
           

摘要

Integrated coal Gasification Combined Cycle (IGCC) is a highly effective power generation system that the gas turbine is operated with the gasified coal in the gasifier. Clean Coal Power R&D Co., Ltd. had been conducting various tests for commercialization with the Nakoso IGCC demonstration plant since September 2007. The plant consists of air-blown gasifier, wet gas clean-up system and 1,200°C class gas turbine to produce 250 MW-gross electricity. Reliability was confirmed by 2,238 h of continuous operation, 18,788 h of accumulated operation and the resulting net thermal efficiency was 42.9% (LHV basis). Various types of coal have been successfully tested, such as North American coal, Indonesian coal, Russian coal and Columbian coal in addition to Chinese plant-designed coal. Although the Great East Japan Earthquake and Tsunami has caused severe damages to plant in March 2011, our IGCC swiftly restored its operation within 4.5 month and has been maintaining stable operation for demonstration project. The demonstration project was finished in March 2013 and the Nakoso IGCC plant is operated commercially by Joban Joint Power Co., Ltd. as high efficiency power generating station.
机译:集成煤气化联合循环(IGCC)是一种高效的发电系统,燃气轮机在气化炉中与气化煤一起运行。自2007年9月以来,清洁煤电研发有限公司一直在Nakoso IGCC示范工厂进行各种商业化测试。该工厂由鼓风气化炉,湿气净化系统和1200°C级燃气轮机组成250兆瓦总电力。连续运行2,238小时,累积运行18,788小时可确保可靠性,并且最终的净热效率为42.9%(以LHV为基础)。除中国工厂设计的煤外,各种类型的煤均已成功测试,例如北美煤,印尼煤,俄罗斯煤和哥伦比亚煤。尽管2011年3月东日本大地震和海啸对工厂造成了严重破坏,但我们的IGCC在4.5个月内迅速恢复了运行,并为示范项目保持了稳定的运行。该示范项目于2013年3月完成,Nakoso IGCC电厂由Joban Joint Power Co.,Ltd.作为高效发电站进行商业运营。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号