...
首页> 外文期刊>Management Science Letters >Identifying the most critical project complexity factors using Delphi method: the Iranian construction industry
【24h】

Identifying the most critical project complexity factors using Delphi method: the Iranian construction industry

机译:使用Delphi方法确定最关键的项目复杂性因素:伊朗建筑业

获取原文

摘要

Complexity is one of the most important issues influencing success of any construction project and there are literally different studies devoted to detect important factors increasing complexity of projects. During the past few years, there have been growing interests in developing mass construction projects in Iran. The proposed study of this paper uses Delphi technique to find out about important factors as barriers of construction projects in Iran. The results show that among 47 project complexity factors, 19 factors are more important than others are. The study groups different factors into seven categories including environmental, organizational, objectives, tasks, stakeholders, technological, information systems and determines the relative importance of each. In each group, many other sub group activities are determined and they are carefully investigated. The study provides some detailed suggestions on each category to reduce the complexity of construction project.
机译:复杂性是影响任何建设项目成功与否的最重要问题之一,字面上有不同的研究致力于发现增加项目复杂性的重要因素。在过去的几年中,在伊朗开展大规模建设项目的兴趣日益浓厚。本文的拟议研究使用德尔菲技术来找出构成伊朗建设项目障碍的重要因素。结果表明,在47个项目复杂性因素中,有19个因素比其他因素更为重要。该研究将不同因素分为七个类别,包括环境,组织,目标,任务,利益相关者,技术,信息系统,并确定每个因素的相对重要性。在每个小组中,确定了许多其他子小组活动,并对其进行了认真调查。该研究针对每个类别提供了一些详细的建议,以减少建设项目的复杂性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号