...
首页> 外文期刊>MACRO REVIEW >Disaster Recovery from the Earthquake in Nepal- Restraining Factors on Politics, Ethnics, and Economics -
【24h】

Disaster Recovery from the Earthquake in Nepal- Restraining Factors on Politics, Ethnics, and Economics -

机译:尼泊尔地震灾后恢复-政治,道德和经济学的制约因素-

获取原文
           

摘要

The big earthquake occurred in April, 2015 caused tremendous damage to the life of people in Nepal. Almost two years has passed, however, the disaster recovery activities including the rehabilitation of infrastructures and the reconstruction of buildings have been delayed. The major factors of these delays are 1) the political turmoil in recent years, 2) the difficulties of the physical distribution between Nepal and India caused by the ethnic problems, and 3) the constraints of the procurement of materials for the reconstruction caused by the weakness of manufacturing industries.
机译:2015年4月发生的大地震对尼泊尔人民的生活造成了巨大破坏。但是,已经过去了将近两年的时间,包括基础设施的恢复和建筑物的重建在内的灾难恢复活动被推迟了。这些拖延的主要因素是:1)近年来的政治动荡; 2)种族问题造成尼泊尔和印度之间的物资分配困难; 3)重建造成的重建物资采购受限制造业的弱点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号