...
首页> 外文期刊>Energies >Operation of Steam Turbines under Blade Failures during the Summer Peak Load Periods
【24h】

Operation of Steam Turbines under Blade Failures during the Summer Peak Load Periods

机译:夏季高峰负荷​​期,汽轮机在叶片故障下的运行

获取原文
   

获取外文期刊封面封底 >>

       

摘要

This paper presents a discussion of practical experience related to the study of a cogeneration system where one of the four steam units occurs a failure of the low-pressure blades during peak load times of the summer months in Taiwan in the year 2007. This study investigates various scenarios consisting of shutting down the damaged unit for repairs and having continued operation of the unit by removing the low-pressure blades and replacing the stationary blade ring with buffer boards. Based on the simulation results, the numerical model has reflected strong agreement with the critical decisions made to operate the damaged unit continuously in a time of the blade failure.
机译:本文讨论了与热电联产系统相关的实践经验,该热电联产系统的四个蒸汽单元之一在台湾夏季月份的高峰负荷时间内在2007年夏季出现低压叶片故障。包括关闭损坏的单元进行维修,以及通过卸下低压叶片并用缓冲板更换固定叶片环以使该单元继续运行的各种方案。基于仿真结果,该数值模型与在叶片故障时连续操作受损单元的关键决策非常吻合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号