首页> 外文期刊>Field Actions Science Reports >Characterization of Contamination Around the Largest Lead Smelter in Egypt Carried Out Through a Cooperation Program between USA and Egypt
【24h】

Characterization of Contamination Around the Largest Lead Smelter in Egypt Carried Out Through a Cooperation Program between USA and Egypt

机译:通过美国和埃及的合作计划对埃及最大的铅冶炼厂周围的污染物进行表征

获取原文
       

摘要

The Government of Egypt together USAID aimed to reduce the impact of lead smelters on the environment. The major site was in Shoubra El-Kheima, where the Awadulla Secondary Lead Smelter is situated. ?The Awadulla Family Company owns about 70% of the lead smelters in Egypt. This work presents the results and conclusions of a detailed on-site and off-site contaminant characterization of the Awadulla Secondary Lead Smelter. ?? As part of the characterization of the smelter site, soil and dust samples were collected within and near the smelter using two methods. The first consisted of collecting bulk dust and soil samples from the floor and ground in the direct vicinity of the smelter. The second involved using wet wipes to collect dust samples from walls, smooth floors, duct work, window and ledges. ?The results indicate that the most contaminated soils can be found in industrial areas and on public streets in Shoubra El-Kheima. The highest lead concentrations of more than 780,000 mg.kg-1 were found inside the smelter site. Concentrations at the El-Mahy Smelter nearby reached 302,275 mg.kg-1. Residential areas had considerably lower lead levels in soil and dust. ?Samples of surface water and groundwater were collected and tested for lead contamination. ?Only three samples had lead concentrations above detection limits, indicating water contamination is not a problem. The maximum area affected by deposition of lead from the Awadulla smelter appears to be no more than 500 m all around the smelter. The plan calls for moving the smelters to a new industrial area called Abu Zaabal. ?This move will leave behind existing structures that are highly contaminated with lead dust.
机译:埃及政府与美国国际开发署共同致力于减少铅冶炼厂对环境的影响。主要站点在Shoubra El-Kheima,Awadulla二级铅冶炼厂就坐落在这里。 Awadulla家族公司拥有埃及约70%的铅冶炼厂。这项工作提出了Awadulla二次铅冶炼厂详细的现场和非现场污染物表征的结果和结论。 ??作为冶炼厂位置表征的一部分,使用两种方法在冶炼厂内和冶炼厂附近收集了土壤和灰尘样品。首先是从冶炼厂附近的地面和地面收集大量粉尘和土壤样品。第二种方法是使用湿巾从墙壁,光滑的地板,管道,窗户和壁架上收集灰尘样品。结果表明,污染最严重的土壤可以在舒布拉·科赫马省的工业区和公共街道上找到。在冶炼厂内发现的最高铅浓度超过780,000 mg.kg-1。附近El-Mahy冶炼厂的浓度达到302,275 mg.kg-1。居民区的土壤和灰尘中铅含量低得多。收集地表水和地下水样品,并测试铅污染。 ?只有三个样品的铅浓度高于检测极限,表明水污染不是问题。阿瓦杜拉冶炼厂的铅沉积影响的最大面积似乎不超过整个冶炼厂的500 m。该计划要求将冶炼厂转移到一个名为Abu Zaabal的新工业区。此举将留下被铅尘高度污染的现有结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号