Insights into the Oroville Dam 2017 Spillway Incident

机译:洞悉2017年奥罗维尔大坝溢洪道事故

获取原文
           

摘要

In February 2017, a failure occurring in Oroville Dam’s main spillway risked causing severe damages downstream. A unique aspect of this incident was the fact that it happened during a flood scenario well within its design and operational procedures, prompting research into its causes and determining methods to prevent similar events from reoccurring. In this study, a hydroclimatic analysis of Oroville Dam’s catchment is conducted, along with a review of related design and operational manuals. The data available allows for the comparison of older flood-frequency analyses to new alternative methods proposed in this paper and relevant literature. Based on summary characteristics of the 2017 floods, possible causes of the incident are outlined, in order to understand which factors contributed more significantly. It turns out that the event was most likely the result of a structural problem in the dam’s main spillway and detrimental geological conditions, but analysis of surface level data also reveals operational issues that were not present during previous larger floods, promoting a discussion about flood control design methods, specifications, and dam inspection procedures, and how these can be improved to prevent a similar event from occurring in the future.
机译:2017年2月,Oroville大坝主要溢洪道发生故障,有可能对下游造成严重破坏。该事件的一个独特方面是,该事件发生在洪水情节的设计和操作程序之内,促使人们对其原因进行了研究,并确定了防止类似事件再次发生的方法。在这项研究中,对Oroville大坝的流域进行了水文气候分析,并审查了相关的设计和操作手册。可用的数据可以将较早的洪水频率分析与本文和相关文献中提出的新替代方法进行比较。根据2017年洪水的概要特征,概述了事故的可能原因,以便了解哪些因素的影响更大。事实证明,该事件很可能是大坝主要溢洪道上的结构性问题和不利地质条件的结果,但是对地表水位数据的分析也揭示了先前较大洪水期间不存在的运营问题,从而引发了有关防洪的讨论设计方法,规格和大坝检查程序,以及如何进行改进以防止将来发生类似事件。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号