...
首页> 外文期刊>Engineering journal >Physical Risk Assessment for Urban Water Supply in a Developing Country: A Case of Mega City Dhaka
【24h】

Physical Risk Assessment for Urban Water Supply in a Developing Country: A Case of Mega City Dhaka

机译:发展中国家城市供水的物理风险评估:以达卡大城市为例

获取原文
   

获取外文期刊封面封底 >>

       

摘要

Water supply access in many developing countries is yet to fulfill Millennium Development Goals. Many local governments are incapable of managing their water resources either due to funding constrains or lack of adequate work force. This often results into poor services with low quality, insufficient and inconsistent delivery of water, leakage and wastage creating water shortages. The water stress resulting from urbanization is more acute in terms of Dhaka city due to its capital city-centric development strategies attracting rural-urban migration, which have resulted into an unplanned horizontal and vertical expansion of the city without having facilities for relevant infrastructures. Therefore, it is important to carry out a risk assessment on existing water supply distribution systems to address the challenges of frequent leaks contributing to cross contamination and system loss arising from unplanned development and aging of pipes. The study is an effort to identify the physical risk for various zones under Dhaka City based on existing distribution systems and its susceptibility to leakage. The assessment requires analyses of distribution system, its length, number of leaks in the pipes detected every month, population density, number of consumers, characteristics of areas whether industrial or residential areas, low lying and vulnerable to flooding. The study finds that Zone IV possesses very high risk and needs immediate attention. (96 views)
机译:许多发展中国家的供水渠道尚未实现千年发展目标。由于资金限制或缺乏足够的劳动力,许多地方政府无力管理水资源。这常常导致服务质量差,供水不足和不一致,漏水和浪费,造成缺水。由于达卡市以首都为中心的发展战略吸引了城乡人口迁移,因此城市化带来的水资源压力更加严重,导致战略性的城市水平和垂直扩张,而没有相关基础设施的建设。因此,重要的是对现有的供水系统进行风险评估,以应对频繁泄漏造成的挑战,这些泄漏会导致交叉污染和由于计划外的管道开发和老化而造成的系统损失。这项研究旨在根据现有的分配系统及其对泄漏的敏感性来确定达卡市下各个地区的物理风险。评估需要分析配电系统,其长度,每月检测到的管道泄漏数量,人口密度,消费者数量,工业或住宅区的特征,低洼和易受洪水侵袭的特征。研究发现,IV区具有很高的风险,需要立即关注。 (96观看次数)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号