首页> 外文期刊>Engineering and Applied Science Research >Development processes of a master plan for flood protection and mitigation in a community area: A case study of Roi Et province
【24h】

Development processes of a master plan for flood protection and mitigation in a community area: A case study of Roi Et province

机译:社区防洪减灾总体规划的制定过程:以黎逸府为例

获取原文
           

摘要

Development processes of a master plan formulation for flood protection and mitigation consists of the selection process of a targeted area based on risk level, developing a present and future flood inundation map and a flood risk map and identify direction and drainage capacity of the targeted area.? Main causes of flooding in the area can be identified? leading to designing flood protection and a flood drainage system in both structural and non-structural measures, prior to a public hearing process from stakeholders to finalize the master plan to provide maximum? benefits and less negative impact.? These processes are applied to Roi Et Province.? Based on flood risk criteria, 24 municipalities with high risk are selected.? The cause of flooding in the municipality area can be combined in 2 groups, flooding from low efficiency of storm drainage capacity and flooding from overbank flow from the Mun, Chi and Yang Rivers.? Structural measures for the first and second group are the improvement of the existing system or changing a new drainage system and the improvement of existing river dikes and levees. It is also possible to design and construct a new one. Constructing a polder system for the community area, requires a budget about 3,338 million baht.? To support structural measures, non-structural measures are required, for example, a flood warning system, an emergency response plan during flood disaster.
机译:防洪减灾总体规划的制定过程包括基于风险水平的目标区域选择过程,制定当前和未来的洪水淹没图和洪水风险图并确定目标区域的方向和排水能力。 ?可以确定该地区洪水的主要原因?导致在利益相关者进行公开听证之前,以结构性和非结构性措施设计防洪和排洪系统,以最终确定总体规划以提供最大的收益?好处和较少的负面影响。这些过程适用于黎逸省。根据洪水风险标准,选择了24个高风险城市。市辖区的洪灾成因可以归为两类,一类是暴雨排水能力低下造成的洪灾,二是孟河,赤河和阳江的过高流量造成的洪灾。第一组和第二组的结构性措施是改善现有系统或更换新的排水系统以及改善现有河堤和堤防。也可以设计和建造一个新的。为社区区域建立田系统,需要约33.38亿泰铢的预算。为了支持结构性措施,需要非结构性措施,例如洪水预警系统,洪水灾害期间的应急计划。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号