首页> 外文期刊>Energy and power engineering >Short-Term Scheduling of Combined Cycle Units Using Mixed Integer Linear Programming Solution
【24h】

Short-Term Scheduling of Combined Cycle Units Using Mixed Integer Linear Programming Solution

机译:混合整数线性规划解的联合循环机组短期调度

获取原文
           

摘要

Combined cycle plants (CCs) are broadly used all over the world. The inclusion of CCs into the optimal resource scheduling causes difficulties because they can be operated in different operating configuration modes based on the number of combustion and steam turbines. In this paper a model CCs based on a mixed integer linear programming approach to be included into an optimal short term resource optimization problem is presented. The proposed method allows modeling of CCs in different modes of operation taking into account the non convex operating costs for the different combined cycle mode of operation.
机译:联合循环工厂(CC)在世界范围内得到广泛使用。将CC包含在最佳资源调度中会造成困难,因为CC可以根据燃烧和蒸汽轮机的数量以不同的运行配置模式运行。本文提出了一种基于混合整数线性规划方法的模型CC,该模型将包含在最优短期资源优化问题中。所提出的方法允许考虑不同组合循环操作模式的非凸面操作成本而对不同操作模式下的CC进行建模。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号