首页> 外文期刊>Electrotehnica, Electronica, Automatica >Borehole Drilling Rig and step-by-step Movement of a Stationary Drilling Installation
【24h】

Borehole Drilling Rig and step-by-step Movement of a Stationary Drilling Installation

机译:钻孔钻机和固定钻探设备的逐步移动

获取原文
           

摘要

Energy efficiency is a priority objective of the research strategy. Particularly, the energy efficiency of the drilling-extraction equipment is an issue of high relevance, the decreasing of energy consumption in crude oil extraction being among the objectives of the research strategy in the oilfield equipment. The overall objective of this project is to implement borehole-drilling techniques with the step-by-step movement of the fully assembled stationary drilling installation and to carry out, as a case study, a technical project for the F 320 DEA / EA borehole drilling rig. The theme is part of the research and development strategy of modern equipment, in the direction of exploiting natural resources in safety and environmental protection.
机译:能源效率是该研究策略的优先目标。特别地,钻采设备的能量效率是高度相关的问题,降低原油提取中的能耗是油田设备研究策略的目标之一。该项目的总体目标是通过逐步组装完全固定的钻井设备来实施钻孔技术,并作为案例研究开展F 320 DEA / EA钻孔技术项目钻机该主题是现代设备研发战略的一部分,旨在开发安全和环保的自然资源。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号