首页> 外文期刊>Electrotehnica, Electronica, Automatica >Probabilistic Method for Circuit Breaker Maintenance Planning
【24h】

Probabilistic Method for Circuit Breaker Maintenance Planning

机译:断路器维修计划的概率方法

获取原文
       

摘要

The primary switching components of the power systems have a very important position, especially the circuit breakers which have the role to set up and to break the nominal current and the short circuit currents, deliberately and automatically, depending on the working conditions. In the present paper, a method to determine the average disconnections number between two consecutive maintenance inspections is proposed based on the influence of the interrupted current value.Keywords: short-circuit current, circuit breaker, average disconnections number
机译:电力系统的主要开关组件具有非常重要的地位,尤其是断路器,其作用是根据工作条件有意自动地建立和断开额定电流和短路电流。本文提出了一种基于中断电流值的影响确定两次连续检修之间平均断线数的方法。关键词:短路电流,断路器,平均断线数

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号