首页> 外文期刊>Earth, planets and space: EPS >A new approach to the hourly mean computation problem when dealing with missing data
【24h】

A new approach to the hourly mean computation problem when dealing with missing data

机译:处理缺失数据时的小时均值计算问题的新方法

获取原文
           

摘要

Geomagnetic observatory records are unavoidably affected by primary data interruptions which, in turn, may have possible effects on the accuracy of the definitive data derived from them. One of the products most widely used by the scientific community is the mean hourly values, immediately obtained from the primary minute values of the geomagnetic field. Although some precepts have already been proposed and used, a definitive criterion regarding the procedure to follow when dealing with missing data has not yet been established. This could be seen in the last IAGA meetings and workshops, where several constructive opinions were put forward in this respect. The present discussion is devoted to analyzing the effects that different amounts of missing data have upon the accuracy of the means, a necessary step before establishing a definitive rule as to how to deal with these situations. In this statistical approach, we propose a new criterion based on the relative value of the root mean square error (between actual and computed means) with respect to the natural magnetic field variations of the original hourly interval.
机译:地磁观测记录不可避免地受到原始数据中断的影响,而原始数据中断反过来可能会对从中得出的确定数据的准确性产生影响。科学界最广泛使用的产品之一是平均小时值,它是从地磁场的主要分钟值立即获得的。尽管已经提出并使用了一些戒律,但尚未建立有关处理丢失数据时要遵循的程序的明确标准。可以在最近的IAGA会议和研讨会上看到这一点,在那方面提出了一些建设性意见。本讨论致力于分析不同数量的丢失数据对方法准确性的影响,这是在确定如何处理这些情况之前确定步骤的必要步骤。在这种统计方法中,我们基于均方根误差(实际和计算均值之间)相对于原始小时间隔的自然磁场变化的相对值,提出了一个新标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号