Coordinated Generation and Transmission Maintenance Scheduling Considering Network Constraints via GGDF and ODF

机译:考虑通过GGDF和ODF的网络约束的协调生成和传输维护计划

获取原文
       

摘要

This paper proposes a coordinated generation and transmission maintenance scheduling by incorporating network constraints. The main advantage of the proposed approach is that maintenance is scheduled at the optimal period of the lowest possible operating cost while satisfying all the specified constraints. In this approach, sensitivity factors (GGDFs and ODFs) which are based on DC approximation are applied to calculate the line flows in normal and maintenance conditions. They are applied due to their simplicity, linearity, physical comprehension and rapidity of computation. To simulate the effect of network constraint on maintenance schedule and operating cost, several cases are studied with and without transmission limit constraints. To ensure the accuracy of these sensitivity factors, power flows on each line are compared with the one obtained from a PSSE simulator. The result shows that generators and transmission lines are scheduled at periods that satisfy the transmission capacity limit.
机译:通过结合网络约束,提出了一种协调的发电和输电维护计划。所提出的方法的主要优点是,在满足所有指定约束的同时,将维护安排在具有最低可能运营成本的最佳时期。在这种方法中,基于直流近似的灵敏度因子(GGDF和ODF)被应用于计算正常和维护条件下的线路流量。由于其简单,线性,物理理解和计算速度快而被应用。为了模拟网络约束对维护计划和运营成本的影响,研究了几种有无传输限制约束的情况。为了确保这些灵敏度因子的准确性,将每条线上的功率流与从PSSE模拟器获得的功率流进行比较。结果表明,发电机和输电线路被安排在满足输电容量极限的时段内。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号