Dams construction globally on rivers have generated a significant adjustment to stream hydrology and sediment dynamics. The impoundment of rivers by dam reservoirs will trap the sediments following freely downstream the river channel. Kahang dam is constructed to impound Sungai Kahang (Kahang River) for water supply purposes; this may have adverse effects downstream the dam by starving the river its natural sediments and changing the river flow. This study evaluates the bedload sediments and river discharge downstream the dam by taking field measurements, using the area-velocity and single increment method at three selected gauging locations (St0, St1, St2). The results obtained between January and July 2017 show the highest bedload discharge for all the gauging Stations to be 0.0736 tones/day at St0 and 0.0077 tones/day at St2 while the river flow remains relatively steady between 0.528 m3/s to 2.534 m3/s. The high bedload discharge recorded can be attributed to the anthropogenic activities going on during external construction works going on, as lower bedload concentration values followed immediately after the external construction work was completed.
机译:全球范围内在河流上修建的大坝已经对河流水文和沉积物动力学产生了重大调整。大坝水库蓄积的河水将在河道下游自由地捕获沉积物。嘉杭水坝的修建是为了给双溪嘉杭(嘉杭河)供水。这可能会对大坝下游造成不利影响,使河水的天然沉积物饿死并改变河水流量。这项研究通过在三个选定的测量地点(St0,St1,St2)采用面积速度和单增量方法进行现场测量,评估了大坝下游的基岩沉积物和河流流量。 2017年1月至2017年7月之间获得的结果表明,所有计量站的最高床载流量在St0为0.0736吨/天,在St2为0.0077吨/天,而河流量在0.528 m3 / s至2.534 m3 / s之间保持相对稳定。记录的较高的床荷排放可归因于外部建筑工作进行期间的人为活动,因为较低的床荷浓度值在外部建筑工作完成后立即随之而来。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号