首页> 外文期刊>International Journal of Innovative Research in Science, Engineering and Technology >Optimal Reservoir Operation Using Genetic Algorithm: A Case Study of Ukai Reservoir Project
【24h】

Optimal Reservoir Operation Using Genetic Algorithm: A Case Study of Ukai Reservoir Project

机译:基于遗传算法的水库优化调度-以乌井水库工程为例

获取原文
       

摘要

Application of optimization techniques for determining the optimal operating policy of reservoirs is a major issue in water resources planning and management. Genetic Algorithm is an optimization technique, based on the principle of natural selection, derived from the theory of evolution, are popular for solving optimization problems. The main aim of the present study is to develop a policy for optimizing the release of water for the purpose of irrigation. The fitness function used is minimizing the squared deviation of monthly irrigation demand along with the squared deviation in mass balance equation. The months considered are from July to October for three years from year 2007 to 2009. The decision variables are monthly releases for irrigation from the reservoir and initial storages in reservoir at beginning of the month. The constraints considered for this optimization are the bounds for the releases and reservoir capacity. Results show that in the year 2007, for months of July and August, 625 and 1573.86 MCM of water is saved respectively. In the year 2008, for July 65.67 MCM, August 27.15 MCM, September 35.32 MCM and October 62.91 MCM of water is saved. In the year 2009, for July 49.18 MCM, August 35.48 MCM, and in October 43.51 MCM of water is saved. Hence, GA model, if applied to the Ukai reservoir project in Gujarat State, India, can completely satisfy downstream irrigation demands and releases are minimized which leads to considerable amount of saving in water.
机译:应用优化技术确定水库的最优运行策略是水资源规划和管理中的一个主要问题。遗传算法是一种基于自然选择原理的优化技术,它是从进化理论中衍生而来的,它普遍用于解决优化问题。本研究的主要目的是制定一项政策,以优化灌溉用水的释放。使用的适应度函数将月度灌溉需求的平方偏差与质量平衡方程中的平方偏差一起最小化。所考虑的月份是从2007年到2009年的三年中的7月到10月。决策变量是水库灌溉的月度排放量和月初的水库初始存储量。该优化考虑的约束条件是释放量和储层容量的界限。结果表明,在2007年中,7月和8月分别节省了625和1573.86 MCM的水。在2008年,节水65.67 MCM,8月27.15 MCM,9月35.32 MCM和10月62.91 MCM。在2009年,节水为7月49.18 MCM,8月为35.48 MCM,10月为43.51 MCM。因此,如果将GA模型应用于印度古吉拉特邦的Ukai水库项目,则可以完全满足下游灌溉需求,并且可以最大程度地减少排放量,从而可以节省大量水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号