首页> 外文期刊>International Journal of Business and Management >Near-bankruptcy of the Taiwan High Speed Rail Corporation: What Went Wrong?
【24h】

Near-bankruptcy of the Taiwan High Speed Rail Corporation: What Went Wrong?

机译:台湾高铁公司近乎破产:出了什么问题?

获取原文
       

摘要

After a few delays, the Taiwan High Speed Rail (THSR), which is the largest current Build-Operate-Transfer (BOT) Railway Project in the world, with eight stations on the line connecting the metropolises of Taipei and Kaohsiung, began its passenger service in January 2007. However, by February 2009, it became very clear that the Taiwan area government must take over the THSR Corporation (THSRC) in one way or another, because the latter had already mired in enormous debts, loosing roughly two thirds of its capitalization. The THSR was only able to break even once in April 2008. This paper spells out the major reasons behind the project’s near-bankruptcy. Some questions will be posed: Who are involved? Who should be responsible for the failure? Should business entrepreneurs venture into High Speed Rail (HSR) projects in the future?
机译:经过数次延误,台湾高铁(THSR)是目前世界上最大的建运转(BOT)铁路项目,拥有连接台北和高雄两市的8条车站,该服务于2007年1月提供服务。但是,到2009年2月,很明显台湾地区政府必须以一种或另一种方式接管THSR Corporation(THSRC),因为后者已经陷入了沉重的债务之中,大约损失了三分之二的债务。大写。 THSR只能在2008年4月收支平衡。本文阐明了该项目濒临破产的主要原因。将提出一些问题:谁参与其中?谁应对失败负责?企业家将来是否应该冒险进入高铁(HSR)项目?

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号