Electricity Generation and Distribution in Nigeria: Technical Issues and Solutions

机译:尼日利亚的发电和配电:技术问题和解决方案

获取原文
           

摘要

This paper attempts to address the problem of extreme electricity shortage in Nigeria. This deficiency is multidimensional which are attributed to inadequate infrastructure, inadequate funding of this sector, and energy losses from generation to billing. Some technical issues were raised and solutions proffered taking the Awka business unit of Power Holding Company of Nigeria, (PHCN) as a case. It was suggested that the actual load demand of the PHCN Awka business unit which at present is 135.12MVA be increased to 150MVA by building new substations to accommodate this proposed new load demand. This new distribution system should be able to handle the present need of the Awka Business Unit of 135.12MVA with a margin capacity of 14.88MVA for future expansion. This when fully implemented will ensure constant and adequate power supply in Awka and its environs.
机译:本文试图解决尼日利亚的极端电力短缺问题。这种缺陷是多方面的,其原因是基础设施不足,该部门的资金不足以及从发电到计费的能源损失。提出了一些技术问题,并提出了解决方案,以尼日利亚Power Holding Company(PHCN)的Awka业务部门为例。建议将PHCN Awka业务部门的实际负载需求(目前为135.12MVA)增加到150MVA,方法是建造新的变电站以适应此提议的新负载需求。这种新的分销系统应该能够满足Awka业务部门目前的需求,即135.12MVA,保证金能力为14.88MVA,以便将来扩展。全面实施后,这将确保Awka及其周围地区的电源持续稳定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号