...
首页> 外文期刊>International Journal of Engineering Business Management >OEE Evaluation of a Paced Assembly Line through Different Calculation and Simulation Methods: A Case Study in the Pharmaceutical Environment:
【24h】

OEE Evaluation of a Paced Assembly Line through Different Calculation and Simulation Methods: A Case Study in the Pharmaceutical Environment:

机译:通过不同的计算和仿真方法对一条装配流水线进行O​​EE评估:以制药环境为例:

获取原文
           

摘要

Modern production systems must guarantee high performance. Increasingly challenging international competition, budget reductions for the health sector and constant technological evolution are just three of the many aspects that drive pharmaceutical companies to continuously improve the productivity of their lines.
机译:现代生产系统必须保证高性能。日益具有挑战性的国际竞争,减少卫生部门的预算以及技术的不断发展只是推动制药公司不断提高其生产线生产率的众多方面中的三个。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号