首页> 外文期刊>International Journal of Construction Engineering and Management >A Case Study on the Problems and Prospects of Output and Performance Based Road Contracting (OPRC) in Ethiopia
【24h】

A Case Study on the Problems and Prospects of Output and Performance Based Road Contracting (OPRC) in Ethiopia

机译:埃塞俄比亚基于产出和绩效的道路承包(OPRC)存在的问题和前景的案例研究

获取原文
       

摘要

The government of Ethiopia has given significant attention to the road sector considering its immense impact on the socio-economic development of the country as road transport reaches the majority of the people. In this respect, the Ethiopian Roads Authority (ERA) is mainly responsible for the construction and maintenance of federal road networks of the country. The road maintenance and construction practice of ERA is predominantly based on the conventional method of quantity and unit rate based by which several works are planned and carried out. The government has faced problems in maintaining the serviceability of road infrastructure systems by using these traditional methods of contracting. However, in recent years other alternative contracting methods are attempted including output and performance based road contracting (OPRC) in the Ethiopian road sector. These types of procurement methods have a substantial success records in many developed and developing countries. Nonetheless, taking the long term nature of the contract into account, OPRC projects require careful planning and capacity from the contracting authority and the contractor to implement it successfully. Hence, this study assessed the problems and prospects of a pilot OPRC project in Ethiopia based on interview of professionals involved in the project. The contractors and the client have been facing many problems in the implementation of the OPRC project and it may be concluded that the project may not be successful unless corrective measures can be taken by both parties to negate the defaults committed by the parties in the contract. Moreover, strong international and local private companies are required to implement such projects successfully otherwise there will be serious challenges to develop future PPP road projects in Ethiopia.
机译:埃塞俄比亚政府对公路部门给予了极大关注,因为公路运输影响了大多数人,这对国家社会经济发展产生了巨大影响。在这方面,埃塞俄比亚道路管理局(ERA)主要负责该国联邦道路网络的建设和维护。 ERA的道路养护和施工实践主要基于常规的数量和单位费率方法,在此基础上计划并进行一些工作。通过使用这些传统的签约方法,政府在维护道路基础设施系统的服务能力方面面临问题。但是,近年来,在埃塞俄比亚道路部门中,尝试了其他替代性承包方法,包括基于产出和基于绩效的道路承包(OPRC)。这些类型的采购方法在许多发达国家和发展中国家都有相当大的成功记录。但是,考虑到合同的长期性,OPRC项目需要承包商当局和承包商的精心计划和能力,才能成功实施。因此,本研究根据对参与该项目的专业人员的采访,评估了埃塞俄比亚OPRC试点项目的问题和前景。承包商和客户在OPRC项目的实施过程中面临许多问题,可以得出的结论是,除非双方可以采取纠正措施来消除合同双方的违约行为,否则该项目可能不会成功。此外,必须有强大的国际和本地私人公司才能成功实施此类项目,否则在埃塞俄比亚发展未来的PPP公路项目将面临严峻挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号