首页> 外文期刊>International Journal of Concrete Structures and Materials >Assessment of Delay Factors for Structural Frameworks in Free-form Tall Buildings Using the FMEA
【24h】

Assessment of Delay Factors for Structural Frameworks in Free-form Tall Buildings Using the FMEA

机译:使用FMEA评估自由形式高层建筑结构框架的延迟因素

获取原文
           

摘要

There are many factors in a common building project that are not relevant for free-form tall building projects, for example, the free-form planes or various shapes of buildings. Among the many risks present in particular in structural frameworks, the risk of delays is an important one and has a considerable effect on the entire project performance. Generally, a delay causes a decrease in constructability and an increase in cost, so eventually the productibility of the structural framework would decrease. Delay management of structural frameworks in free-form tall buildings is currently performed by project managers based on personal experience and intuition. This nonsystematic management results from the lack of data that are essential for the planning construction process reflected in the particular considerations of the free-form tall building. This study identified the delay factors that can occur in the structural framework of free-form tall building projects and analyzed priorities for delay management. First, the scope of free-form tall buildings was identified, and particular considerations for the structural framework in their construction were determined, such as plane, elevation, floor height, and structure. Delay factors for each category were recognized through interviews with experts with experience in such projects. To prioritize the delay factors, the occurrence and severity of each factor were surveyed. A risk priority number was calculated from the survey results, and the priority was analyzed. The results of this study could serve as preliminary data for the planning construction process of structural frameworks in free-form tall buildings.
机译:常见建筑项目中有许多因素与自由形式的高层建筑项目无关,例如,自由形式的平面或各种形状的建筑物。特别是在结构框架中存在的许多风险中,延迟的风险是重要的风险,并且对整个项目的绩效有相当大的影响。通常,延迟会导致可构造性降低并增加成本,因此最终结构框架的生产率会下降。目前,项目经理根据个人经验和直觉来对自由形式的高层建筑中的结构框架进行延迟管理。这种非系统的管理是由于缺乏对自由式高层建筑的特殊考虑所反映的对规划施工过程至关重要的数据。这项研究确定了自由式高层建筑项目结构框架中可能出现的延迟因素,并分析了延迟管理的优先事项。首先,确定自由形式的高层建筑的范围,并确定其建造过程中对结构框架的特殊考虑,例如平面,立面,地板高度和结构。通过与具有此类项目经验的专家进行访谈,可以识别出每个类别的延迟因素。为了优先考虑延迟因素,调查了每个因素的发生和严重性。从调查结果中计算出风险优先级数,并对优先级进行了分析。这项研究的结果可以作为自由形式高层建筑结构框架规划施工过程的初步数据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号