首页> 外文期刊>International Journal of Basic and Applied Sciences >Simulation of trans boundary wastewater resource management scenarios in the Wadi Zomer watershed, using a WEAP model
【24h】

Simulation of trans boundary wastewater resource management scenarios in the Wadi Zomer watershed, using a WEAP model

机译:使用WEAP模型模拟Wadi Zomer流域的跨界废水资源管理方案

获取原文
       

摘要

Water resource shortages are always a challenge for Middle Eastern countries in general and for the Palestinian Authority in particular. For over 20 years in Palestine, political factors and a lack of control over water resources have exacerbated the water problem there, seriously affecting water resources, in terms of quality and quantity. This research presents one of the applications of the Water Assessment and Planning (WEAP) model in the Nablus and Tulkarm watershed. The model is applied in evaluating and analyzing the existing balance and the role of treated wastewater and anticipates future scenarios for the management of water resources, taking into account the policies and operating the various factors that may affect the demand and the impact of treated wastewater on the water budget until 2035. The results showed that the amount of treated wastewater in the study area will reach 16 MCM by 2035. The agricultural sector needs 17 MCM and currently only 2.8 MCM are available from artesian wells. The results also showed that one of the reasons for not using treated wastewater is a lack of experience in the planning and selection of wastewater treatment plant sites and of the capacity to match these with agricultural land that could reuse the treated wastewater. Demand management and improvements in living standards are the prerequisites necessary for the proper management of available resources. The results confirmed that the WEAP program provides a solid foundation to assist planners in developing recommendations for the management of water resources in the future, through the detection of hot spots on which to work.
机译:水资源短缺始终是整个中东国家尤其是巴勒斯坦权力机构的挑战。在巴勒斯坦20多年来,政治因素和对水资源的缺乏控制加剧了那里的水问题,从质量和数量上严重影响了水资源。这项研究提出了水评估与计划(WEAP)模型在纳布卢斯和图尔卡姆流域中的一种应用。该模型用于评估和分析处理后废水的现有平衡和作用,并考虑到政策和操作可能影响处理后废水的需求和影响的各种因素,并预测水资源管理的未来方案。直到2035年的水预算。结果表明,到2035年,研究区的处理废水量将达到16 MCM。农业部门需要17 MCM,目前自流井只能提供2.8 MCM。结果还表明,不使用经过处理的废水的原因之一是缺乏对废水处理厂场址的规划和选择的经验,并且缺乏将其与可以再利用经过处理的废水的农业用地相匹配的能力。需求管理和生活水平的提高是适当管理可用资源的必要先决条件。结果证实,WEAP计划为基础,通过发现工作热点来协助规划人员为将来的水资源管理提出建议提供了坚实的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号