首页> 外文期刊>International Journal of Advanced Statistics and Probability >Stochastic renewal process model for maintenance (case study: thermal electricity generation in Sudan)
【24h】

Stochastic renewal process model for maintenance (case study: thermal electricity generation in Sudan)

机译:用于维护的随机更新过程模型(案例研究:苏丹的热力发电)

获取原文
       

摘要

The renewal process defines as a counting process where the times between the count renewals is a random variables and their distribution is identical. In the electricity generation machines there are spare parts replaced due to damage or expired and replacement process occur repeatedly and the renewal process of here assume that times between replacements are independent random variables and it has identical probability distribution. In this paper, renewal process model has applied on the time of fault for machine in Bahri Thermal Station for electricity generation, which is belong to the National Electricity Authority in Sudan during the period (2011-2015). Through the renewal process model estimation is clear that, the failure time (renewal) for the machines follow Weibull distribution with 2-parameters and when the time trend has been tested it is clear that no trend exist which mean that the renewal process represent Homogeneous Poisson Process (HPP), and the repair rate (renewal) is occurred constantly. In addition, the findings approve that whenever the repair rate (renewal) increase the mean time between failures (MTBF) increases too and this clear in machine no (6).
机译:更新过程定义为计数过程,其中计数更新之间的时间是随机变量,并且它们的分布是相同的。在发电机器中,由于损坏或过期而替换了备用零件,并且替换过程反复发生,并且这里的更新过程假设替换之间的时间是独立的随机变量,并且具有相同的概率分布。本文将更新过程模型应用于Bahri热电站发电设备的故障时间,该时间段属于苏丹国家电力管理局(2011-2015)。通过更新过程模型估计可以清楚地看到,机器的故障时间(更新)遵循具有2参数的Weibull分布,并且在测试了时间趋势后,很明显没有趋势存在,这意味着更新过程代表均质Poisson过程(HPP)和修复率(更新)不断发生。此外,研究结果认为,每当维修率(更新)增加时,平均故障间隔时间(MTBF)也会增加,这在机器编号(6)中显而易见。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号