首页> 外文期刊>Industrial Engineering Letters >Installation, Testing and Jointing of LT and HT Power Cables up to 33 KV
【24h】

Installation, Testing and Jointing of LT and HT Power Cables up to 33 KV

机译:最高33 KV的LT和HT电力电缆的安装,测试和连接

获取原文
           

摘要

In the electrical power distribution and transmission system for urban and rural area, overhead lines are usually in major practice. Underground system was not favourable in developing and under developed countries. The main reason behind it was the much higher capital investment of underground cabling with respect to overhead bare conductors. But with the advancement in technology and market competition its cost is manageable for urban areas. This system requires more skills and planning for installation, jointing and termination rather than overhead lines. The presented paper is applied on power distribution system up to 33 KV.
机译:在城乡配电和输电系统中,架空线通常是主要实践。发展中国家和发达国家的地下系统都不是很好的选择。其背后的主要原因是地下电缆相对于架空裸线的资本投资更高。但是随着技术和市场竞争的发展,城市地区的成本是可控的。该系统需要更多的技能和计划来进行安装,连接和端接,而不是架空线。提出的论文适用于最高33 KV的配电系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号