首页> 外文期刊>IHI engineering review >Learning from Disaster:The First Step Toward a World-Class Soma Works
【24h】

Learning from Disaster:The First Step Toward a World-Class Soma Works

机译:从灾难中学习:走向世界一流的索马工程的第一步

获取原文
       

摘要

The Soma Works recovered from the Tohoku Earthquake and tsunami and resumed production with extraordinary speed. Now, the facility is transitioning from a disaster recovery phase to an expansion phase, and a variety of lessons learned from the disaster are being implemented. The first major actions are Business Continuity Planning (BCP) and the photovoltaic (PV) solar power generation system introduced as a power-saving measure. This involves a new model of renewable energy utilization.
机译:索马工厂从东北地震和海啸中恢复过来,并以惊人的速度恢复了生产。现在,该设施正从灾难恢复阶段过渡到扩展阶段,并且正在实施从灾难中汲取的各种教训。首要的主要行动是引入业务连续性计划(BCP)和光伏(PV)太阳能发电系统作为一种节电措施。这涉及可再生能源利用的新模式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号