Niigata Power Systems Co., Ltd. has successfully halved the costs and shortened the lead time to one third as well as improved production capacity while getting rid of conventional manufacturing practices. To this end, its production division reviewed the upstream design to standardize and visualize processes and eliminate waste work.
展开▼