首页> 外文期刊>Independent Journal of Management & Production >Analyzing the postponement of time production systems in maketostock and seasonal demand
【24h】

Analyzing the postponement of time production systems in maketostock and seasonal demand

机译:分析库存生产和季节性需求中时间生产系统的延迟

获取原文
           

摘要

The supply chain management, postponement and demand management functions are of strategic importance to the economic success of organizations because they influence the production process, when viewed in isolation and empirically may hinder understanding of their behavior. The aim of this paper is to analyze the influence of the postponement in an enterprise production system with make-to-stock and with seasonal demand. The research method used was a case study, the instruments of data collection were semi-structured interviews, documentary analysis and site visits. This research is restricted to analysis of the influence that different levels of delay and the company's position in the supply chain have on the practice of demand management in the productive segment graphic, product spiral notebook and also in relation to geographical focus (region of the state S?o Paulo), in which it will seek to interview the managers and directors. As a way to support the research on the analysis of case study and the final considerations will be discussed the following issues: supply chain management, postponement, demand management and production system make-to-stock. The demand management can be understood as a practice that allows you to manage and coordinate the supply chain in reverse, i.e. the consumer to the supplier, in which consumers trigger actions for the supply of products can make the process more efficient. The purpose of managing the supply chain is able to allow the addition of value, exceeding the expectations of consumers, it is necessary to develop a relationship with suppliers and customers win-win. The postponement strategy must fit the characteristics of the turbulent environment within the markets along with demands that require variety of customized products and services and reasonable costs, aiming to support decision making. The postponement of time can be a way to soften the increase in inventory of finished product in the company, which may have a high value, being necessary to reduce the lead time and also suppliers to change their production strategy of make- to-stock to make-to-order. The production system make-to-stock shows enough interest to organizations that are operating in markets with high demand variability, i.e. variations in seasonal as a way of trying to protect their production and be more responsive to market needs.
机译:供应链管理,推迟和需求管理功能对于组织的经济成功具有战略重要性,因为它们会影响生产过程,如果孤立地看待和凭经验来看可能会影响他们的行为。本文的目的是分析按库存生产和季节性需求的企业生产系统中延迟的影响。使用的研究方法是案例研究,数据收集的工具是半结构化访谈,文献分析和实地考察。本研究仅限于分析不同程度的延迟和公司在供应链中的地位对生产环节图形,产品螺旋笔记本中的需求管理实践以及与地理重点(国家区域)有关的影响的分析。圣保罗),它将寻求采访经理和董事。作为支持案例分析和最终考虑因素研究的一种方法,将讨论以下问题:供应链管理,延迟,需求管理和按库存生产的系统。需求管理可以理解为一种实践,它允许您反向管理和协调供应链,即从消费者到供应商,在这种情况下,消费者触发产品供应的操作可以使流程更高效。管理供应链的目的是能够使价值增值,超出消费者的期望,有必要与供应商发展关系,并与客户双赢。推迟策略必须适应市场动荡环境的特征,以及要求各种定制产品和服务以及合理成本的需求,以支持决策。时间的延迟可能是减轻公司成品库存增加的一种方法,这种方法可能具有很高的价值,这对于减少交货时间以及供应商将其按库存生产策略更改为按订单生产。生产系统按库存生产对在高需求可变性(即季节性变化)中运行的组织表示了足够的兴趣,即试图保护其生产并更好地响应市场需求的一种方式。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号