...
首页> 外文期刊>Annals of Warsaw University of Life Sciences-SGGW. Land Reclamation >Long-term settlement induced by EPB tunnelling studied with numerical simulations
【24h】

Long-term settlement induced by EPB tunnelling studied with numerical simulations

机译:数值模拟研究EPB隧道引起的长期沉降

获取原文
           

摘要

Long-term settlement induced by tunnelling in soft cohesive subsoil is rarely considered as a subject for research despite substantial evidence that it increases considerably after construction. The paper aims to investigate the time effects of tunnelling with an earth pressure balance (EPB) shield by means of analysing subsoil deformation with the most up-to-date numerical tool. A three-dimensional numerical model with a detailed description of the geometrical and mechanical characteristics of the tunnelling process and the various materials involved was built. The computational model validated on a real-case was then used to simulate tunnelling in different groundwater conditions prior to construction. That was followed by a simulation of groundwater drawdown conditions after tunnelling with impermeable and permeable tunnel linings. The calculations show the development of the settlement over time in different groundwater conditions together with the significant influence of the permeability of the tunnel.
机译:尽管有充分的证据表明,在施工后,可凝结的软土地基中的隧道沉降引起的长期沉降很少被视为研究的主题。本文旨在通过使用最新的数值工具分析地基土变形来研究带地压平衡(EPB)盾构的隧道的时间效应。建立了三维数值模型,详细描述了隧穿过程的几何和机械特性以及所涉及的各种材料。在实际情况下验证的计算模型然后用于在施工之前模拟在不同地下水条件下的隧穿。随后模拟了使用不透水和可透水隧道衬砌的隧道掘进后的地下水汲水条件。计算结果表明,在不同的地下水条件下,沉降随时间的发展以及隧道渗透性的显着影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号