...
首页> 外文期刊>Archives of mining sciences >Results of the Promethee Method Application in Selecting the Technological System at the Majdan III Open Pit Mine
【24h】

Results of the Promethee Method Application in Selecting the Technological System at the Majdan III Open Pit Mine

机译:Promethee方法在Majdan III露天煤矿技术系统选择中的应用结果

获取原文
           

摘要

This paper discusses the application of the PROMETHEE model and the results achieved in practice, following the example of the multi-criteria selection of the technological system at the Majdan III clay mineral raw material open pit mine of the Potisje Company, Republic of Serbia. After the introduction comments, reasons are explained for selecting the new technological system, conditions and limitations for the seven alternative solutions considered are described, mathematical foundation for the PROMETHEE method and a multi-criteria model of the problem in question are presented. The solution with the following structure was ranked first and accepted by the Company management as the best: Bucket chain excavator – Conveyor belts – Spreader (ECS), alongside a decision is made on the acquisition of machinery and system construction. The system was put into operation in 2000. The experience and the data accumulated in the previous twelve years confirm that the decision made on the application of the ECS technology was just, and the conclusion lists the benefits achieved.
机译:本文以塞尔维亚共和国Potisje公司的Majdan III粘土矿物原料露天矿的技术体系的多标准选择为例,讨论了PROMETHEE模型的应用以及在实践中取得的结果。在引言之后,解释了选择新技术系统的原因,描述了所考虑的七个替代解决方案的条件和局限性,提出了PROMETHEE方法的数学基础以及所讨论问题的多准则模型。具有以下结构的解决方案名列第一,并被公司管理层接受为最佳方案:斗式链挖掘机–传送带–撒布机(ECS),同时还决定了购买机械和系统结构的决定。该系统于2000年投入运行。在过去的十二年中积累的经验和数据证实,对于ECS技术的应用做出的决定是公正的,并且结论列出了所取得的收益。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号