...
首页> 外文期刊>Archives of mining sciences >Method of the Production Cycle Duration Time Modeling Within Hard Coal Longwall Faces
【24h】

Method of the Production Cycle Duration Time Modeling Within Hard Coal Longwall Faces

机译:硬煤长壁工作面生产周期持续时间建模方法

获取原文

摘要

Method of probabilistic modeling of the production cycle duration time within hard coal longwall faces has been described in the present study. Duration of these activities for various technologies, including probabilistic schemes modeling have been described in the introduction.In order to illustrate the described method, an example of probabilistic modeling for data obtained from specific longwall face has been presented. The final chapters entitled “The possibility of Using the method” and “Results” contain information on the perspective of the method application in mining industry.
机译:在本研究中描述了在硬煤长壁工作面内生产周期持续时间的概率建模方法。导言中描述了这些技术对各种技术的持续时间,包括概率方案建模。为了说明所描述的方法,给出了对从特定长壁工作面获得的数据进行概率建模的示例。标题为“使用该方法的可能性”和“结果”的最后一章包含有关采矿行业中该方法应用前景的信息。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号