首页> 外文期刊>Applied Sciences >Modular and Offsite Construction of Piping: Current Barriers and Route
【24h】

Modular and Offsite Construction of Piping: Current Barriers and Route

机译:模块化和异地管道施工:当前的障碍和路线

获取原文
           

摘要

To investigate current practices and identify challenges of piping prefabrication, this paper conducts a comprehensive survey to mechanical, electrical, and plumbing (MEP) contractors. This paper is performed in three main steps. First, the current state of piping prefabrication, the attitude of MEP contractors to piping prefabrication, and the challenges of piping prefabrication are identified through a comprehensive data collection process that included semi-structured interviews, case studies, site visits, and questionnaires. The second step included suggesting a pattern and roadway of piping prefabrication. The results showed that: (1) The attitudes to feasibility of piping prefabrication differ in piping systems, piping connector modes, and types of project; and (2) building information modelling (BIM) promotes the adoption of piping prefabrication. Integrated project delivery (IPD), and distributor’s early involvement into projects have significant effects on the successful implementation of piping prefabrication. (3) The main barriers and challenges were identified including the low level of standardization of design, lack of preferential policy, economies of scale, low-skilled workers, as well as the availability of fittings and valves. In the final step, a four-phase route of piping prefabrication is suggested for MEP contractors to expand the prefabrication capacity incrementally. The main contributions of this paper include: (1) This paper proposes a route for MEP contractors to improve their piping construction through the Modular and offsite construction (MOC) method. (2) This paper finds that the level of feasibility of piping prefabrication differs in piping systems, connection modes, and types of project. Challenges and barriers of piping prefabrication are firstly identified.
机译:为了调查当前的做法并确定管道预制件的挑战,本文对机械,电气和管道(MEP)承包商进行了全面调查。本文分三个主要步骤执行。首先,通过全面的数据收集过程(包括半结构化访谈,案例研究,现场访问和问卷调查),确定了管道预制件的现状,MEP承包商对管道预制件的态度以及管道预制件的挑战。第二步包括建议管道预制的方式和巷道。结果表明:(1)管道系统,管道连接器方式和工程类型对管道预制可行性的态度有所不同; (2)建筑信息模型(BIM)促进了管道预制件的采用。集成项目交付(IPD)和分销商及早参与项目对管道预制件的成功实施产生重大影响。 (3)确定了主要障碍和挑战,包括设计标准化水平低,缺乏优惠政策​​,规模经济,低技能工人以及配件和阀门的可用性。在最后一步中,建议为MEP承包商分四阶段进行管道预制,以逐步扩大预制能力。本文的主要贡献包括:(1)本文提出了MEP承包商通过模块化和异地施工(MOC)方法改善其管道施工的途径。 (2)本文发现管道预制的可行性水平在管道系统,连接方式和项目类型上有所不同。首先确定管道预制的挑战和障碍。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号